Bring Your Own Generation: A New Path to Power for Data Centers

GPC Blog: BYO Power Generation

For data center developers, securing a site is only part of the equation. Securing enough power to support that site on a timeline that aligns with development plans has become a much more complicated challenge. As grid operators, utilities, and regulators look for new ways to accommodate increasingly large loads, bring your own generation (BYOG) is emerging as another potential path forward.

The concept is relatively straightforward. Rather than relying exclusively on existing grid capacity to serve a new large load, a data center developer brings new generation or capacity to help support its power requirements. Depending on the market and project structure, that could involve onsite power generation, co-located generation, contracted generation, or another arrangement that more closely pairs new electricity demand with new power supply.

What is less straightforward is putting that strategy into practice.

Why Bring Your Own Generation Is Gaining Attention

The scale and speed of data center development are challenging traditional approaches to power planning. According to the U.S. Department of Energy, data centers consumed approximately 4.4% of U.S. electricity in 2023, with demand expected to rise significantly as AI and other compute-intensive applications expand. More recent analysis from Lawrence Berkeley National Laboratory estimates that data centers could account for 11.8% of U.S. electricity use by 2030.

That growth is creating new challenges for connecting large loads. A 2026 Lawrence Berkeley National Laboratory report found that rapid demand growth from data centers and other large energy users is contributing to grid connection bottlenecks across the country. The report identifies more than 40 potential approaches for accelerating connections, spanning interconnection, resource planning and procurement, market operations, and cost allocation.

That concept is gaining greater attention as regulators and regional grid operators consider new ways to connect large loads without placing additional strain on existing generation and transmission resources. In June 2026, the Federal Energy Regulatory Commission (FERC) directed the six regional transmission organizations and independent system operators under its jurisdiction to examine whether their existing rules adequately address the interconnection of large loads, including data centers.

One approach receiving increased attention is pairing new large loads with new generation. Rather than evaluating the load and generation entirely separately, emerging frameworks could allow them to be studied together, particularly when the new generation is intended to support the new demand. This type of joint load and generation approach more directly connects data center development with the energy resources required to support it.

Against this backdrop, bring your own generation data centers represent a shift in how developers can think about power. Instead of treating generation as separate from the development process, projects can begin evaluating load and generation together much earlier.

BYOG Is Not a One-Size-Fits-All Strategy

Bring Your Own Generation does not simply mean building a power plant next to a data center. There is no single BYOG model, and the available options can vary significantly by market.

Generation may be located onsite or co-located with the facility. Other approaches may involve contracted generation or capacity rather than direct ownership. Utility requirements, regional market rules, fuel availability, permitting, transmission infrastructure, and the configuration of the project itself can all influence what is possible.

Federal regulators and regional grid operators are also actively examining how these arrangements should work. New approaches are emerging around large loads paired with associated generation, including frameworks designed to evaluate how new generation can help offset the grid impacts created by new demand. The details will vary by region, making it important for developers to understand which interconnection pathways are available in the market where they plan to build.

For developers, this means power strategy increasingly needs to be considered alongside site selection, financing, permitting and construction rather than after those decisions have already been made.

Connecting BYOG With GPC Behind-the-Meter Power

For some projects, behind-the-meter power can provide a practical foundation for a Bring Your Own Generation strategy. Instead of waiting exclusively for traditional utility infrastructure to support the full campus load, developers can deploy dedicated data center energy infrastructure designed around the requirements and development schedule of the site.

This is where GPC Infrastructure’s Energy as a Service model can help simplify a complex process.

GPC develops, finances, owns, and operates onsite power infrastructure, bringing together generation equipment, engineering, fuel strategy, construction, operations, and capital. This integrated approach can help developers evaluate data center power solutions earlier and align generation capacity with the phased growth of a campus.

Importantly, onsite power generation does not necessarily mean choosing between dedicated generation and the grid. Depending on the project, behind-the-meter infrastructure can become part of a broader power strategy that supports near-term energization while maintaining options for future grid connectivity.

How GPC Infrastructure Can Help

Bring your own generation frameworks are still evolving, and requirements will differ across utilities, states and regional transmission organizations. But the growing discussion around BYOG, co-located generation and large load interconnection reflects a broader change in data center development.

Power generation, interconnection, financing, equipment availability, permitting and long-term operations are becoming increasingly interconnected decisions.

As bring your own generation frameworks continue to evolve, navigating the available pathways will become an increasingly important part of data center development. GPC Infrastructure helps bring generation, interconnection strategy, financing, equipment, engineering and long-term operations together, giving developers a partner that can help evaluate how emerging BYOG approaches and onsite power solutions fit within the broader path from site selection to energization.

Learn more about the GPC team and contact us today to see how we can assist with your generation needs today. 